Projects



(click image to enlarge)

Zorlu Enerji for General Electric-S&S Energy Products, Bursa, Turkey

PROJECT

  • 36,000 KW Combined-cycle Plant

EQUIPMENT

  • Combustion Turbine: One (1) GE LM2500+PK, Dual Fuel*
  • Electric Generator: Brush Electric with SSS Clutch
  • Steam Turbine: Siemens Condensing
  • Heat Recovery Boiler: One Desa/Vogt-NemTwo-Pressure
  • Air Cooled Condenser: GEA Power Cooling Systems
  • Distributed Control System: Westinghouse WDPF II

OPERATING DATE

  • August 1998, Simple-cycle
  • November 1998, Combined-cycle

ARCHITECT-ENGINEERS

  • ENERGY SERVICES, INC.
  • Phase 1: Cycle Selection and Proposal Preparation in Joint Effort with GE
  • Phase 2: Design Engineering, Construction Technical Support, Plant Commissioning, Operator Training, and Performance Testing

* First LM2500+PK Driving Common Generator with Steam Turbine


TECHNICAL PAPERS/ARTICLES ASSOCIATED WITH THIS PROJECT

Project Search

Our global company has completed projects in many countries. Use search button below for more detailed information, technical papers and simulated videos on specific projects.

Search