Zorlu Enerji for General Electric-S&S Energy Products, Bursa, Turkey

PROJECT

  • 36,000 KW Combined Cycle Plant

EQUIPMENT

  • Combustion Turbine: One (1) GE LM2500+PK, Dual Fuel*
  • Electric Generator: Brush Electric with SSS Clutch
  • Steam Turbine: Siemens Condensing
  • Heat Recovery Boiler: One Desa/Vogt-NemTwo-Pressure
  • Air Cooled Condenser: GEA Power Cooling Systems
  • Distributed Control System: Westinghouse WDPF II

OPERATING DATE

  • August 1998, Simple Cycle
  • November 1998, Combined Cycle

ARCHITECT-ENGINEERS

  • ENERGY SERVICES, INC.
  • Phase 1: Cycle Selection, Proposal Preparation in Joint Effort with GE
  • Phase 2: Design Engineering, Construction Technical Support, Plant Commissioning, Operator Training, Performance Testing

* First LM2500+PK Driving Common Generator with Steam Turbine