Combustion Turbine Generators: Two (2) GE LM6000PC, Dual Fuel
Heat Recovery Boilers: Two (2) Desa/Vogt-NemThree-Pressure
Steam Turbine Generator: GE Single Auto Extraction/Admission
Surface Condenser: Holtec International
Cooling Tower: GEA Thermal Dynamic Towers
High Voltage Switchyard: Siemens
OPERATING DATE
January 1999, Simple-cycle
September 1999, Combined-cycle
ARCHITECT-ENGINEERS
ENERGY SERVICES, INC.
Phase 1: Cycle Selection and Proposal Preparation in Joint Effort with GE
Phase 2: Design Engineering, Construction Technical Support, Plant Commissioning, Operator Training, and Performance Testing