Entek for General Electric-S&S Energy Products, Bursa, Turkey

PROJECT 

  • 110,000 KW Combined Cycle Cogeneration Plant

EQUIPMENT

  • Combustion Turbine Generators: Two (2) GE LM6000PC, Dual Fuel
  • Heat Recovery Boilers:TwoDesa/Vogt-NemThree-Pressure
  • Steam Turbine Generator: GE Single Auto Extraction/Admission
  • Surface Condenser: HoltecInterantional
  • Cooling Tower: GEA Thermal Dynamic Towers
  • High Voltage Switchyard:  Siemens

OPERATING DATE

  • January 1999, Simple Cycle
  • September 1999, Combined Cycle

ARCHITECT-ENGINEERS 

  • ENERGY SERVICES, INC.
  • Phase 1:  Cycle Selection, Proposal Preparation in Joint Effort with GE
  • Phase 2:  Design Engineering, Construction Technical Support, Plant Commissioning, Operator Training, Performance Testing