Turnkey Contract to Provide Equipment, Engineering and Project/Construction Management for a 120 MW Emergency Generation Program for the Ecuadorian Institute of Electrification at their Santa Elena and Santo Domingo site locations.
EQUIPMENT
SANTA ELENA - One (1) Worthington HC4-2 Gas Turbine Generating Unit
SANTO DOMINGO - Two (2) United Technologies FT4C-1 Twin-Pac Gas Turbine Generating Units
CONTRACT REQUIREMENTS
Acquire and Dismantle Equipment, Refurbishment, Testing, Transportation, Design, Engineering, Construction Management, Plant Start-up, and Operation and Maintenance
OPERATING DATE
SANTA ELENA - February 3, 1996 (60 days after Notice to Proceed)
SANTO DOMINGO - March 4, 1996 (68 days after Notice to Proceed)