Rapid Turnkey Deployment

Fast Turnkey Deployment in Mexico

Energy Services has been instrumental in the success of several FT8® MOBILEPAC® gas turbine packaging and installation projects. In June of 2021, Energy Services completed the supply, installation, and commissioning of five 30-megawatt MOBILEPAC units for CFEnergia in Mexicali, Baja California. This fast-track, dual-fuel installation took just 110 days from contract to commercial operation and provided emergency power continuously during the four months of summer peak. Three more MOBILEPAC units were added to the site in 2022 for the summer peak. These eight MOBILEPAC gas turbines operate in the hottest months of the year to provide up to 240 MW of power when it is needed the most.

Fast-track Turnkey Deployment in Algeria

In 2015, the Algerian city of M’Sila, a metropolis of more than a million people, experienced a series of crippling power shortages and rolling blackouts when two of its main electricity generating plants shut down. Sonelgaz, the government-owned power company in Algeria, needed help restoring the M’Sila grid to full capacity. Energy Services provided turnkey installation for the 12 MOBILEPAC units deployed by Mitsubishi Power Aero (formerly PW Power Systems) at the M’Sila Power Plant. Subsequently, Energy Services supplied and installed another 42 MOBILEPAC units for a total of 54 mobile units in Algeria. Quick, reliable, mobile power is especially important in emergency and fast-track situations. The MOBILEPAC units can operate in “island mode” when the main power supply is interrupted, thereby creating a micro grid.